So here I am trying to score brownie points with my most difficult to please client (the wife)
Has been badgering me for a little while to create a shelving unit for under the stairs, I quickly wrote some measurements a while ago for said unit.
1700 x 838 x 500mm
Knowing that this needed to sit behind the door frame, I had to make it to the doorframe internal width, and I could basically slide it in and around.
Imagine my horror when I made said unit, and the width I had written down was wall to wall.
Just a massive coincidence that the wall width is also the same width as a standard interior door!!
But I did use cabinet vision so will show you drawing versus unit made.
c*ck up
-
mark270981
- Subscriber
- Posts: 2766
- Joined: Sun Apr 04, 2010 8:06 pm
- Location: Sutton Coldfield
- Contact:
c*ck up
--------------------------------------------------------------
ALOTBSOL
Mark - Sutton Coldfield
ALOTBSOL
Mark - Sutton Coldfield
-
mark270981
- Subscriber
- Posts: 2766
- Joined: Sun Apr 04, 2010 8:06 pm
- Location: Sutton Coldfield
- Contact:
Re: c*ck up
If anyone is interested in the time the process took from drawing to making of the unit.
Drawing 15 minutes
Machining 18minutes
Assembly 42minutes (I have included the clearing of the CNC within this figure)
So complete process from start to finish.
1 hour and 15 minutes.
Drawing 15 minutes
Machining 18minutes
Assembly 42minutes (I have included the clearing of the CNC within this figure)
So complete process from start to finish.
1 hour and 15 minutes.
--------------------------------------------------------------
ALOTBSOL
Mark - Sutton Coldfield
ALOTBSOL
Mark - Sutton Coldfield
Re: c*ck up
somewhere along the line, the base changed too 
-
mark270981
- Subscriber
- Posts: 2766
- Joined: Sun Apr 04, 2010 8:06 pm
- Location: Sutton Coldfield
- Contact:
Re: c*ck up
Well to be fair - I did change that as I wanted an integrated plinth rather than a separate plinth as shown in the render.
Cab vision is brilliant I must admit.
Cab vision is brilliant I must admit.
--------------------------------------------------------------
ALOTBSOL
Mark - Sutton Coldfield
ALOTBSOL
Mark - Sutton Coldfield
Re: c*ck up
the time from design to finish is very impressive 
-
promhandicam
- Moderator
- Posts: 3150
- Joined: Wed Oct 17, 2007 8:50 am
- Location: Surrey
- Contact:
-
mark270981
- Subscriber
- Posts: 2766
- Joined: Sun Apr 04, 2010 8:06 pm
- Location: Sutton Coldfield
- Contact:
Re: c*ck up
Are we including the rebuild at the correct size! Plus a couple of wasted journeys?!
--------------------------------------------------------------
ALOTBSOL
Mark - Sutton Coldfield
ALOTBSOL
Mark - Sutton Coldfield
-
houtslager
- Subscriber
- Posts: 512
- Joined: Wed Oct 03, 2007 11:02 am
- Location: Amsterdam /Chipping Norton /Uplengen
- Contact:
Re: c*ck up
Are we including the rebuild at the correct size! Plus a couple of wasted journeys?!
ooooei ! that's below the belt.
LOL
You name it, I'll butcher it.
Re: c*ck up
Looks like I have a contender for my crown there. LOL.
-
mark270981
- Subscriber
- Posts: 2766
- Joined: Sun Apr 04, 2010 8:06 pm
- Location: Sutton Coldfield
- Contact:
Re: c*ck up
Just out of interest, how long do you think that would take you Alan from start to finish? its 1700 high by 838 wide by 500 deep. all 18mm MDF.
--------------------------------------------------------------
ALOTBSOL
Mark - Sutton Coldfield
ALOTBSOL
Mark - Sutton Coldfield
-
promhandicam
- Moderator
- Posts: 3150
- Joined: Wed Oct 17, 2007 8:50 am
- Location: Surrey
- Contact:
Re: c*ck up
mailee wrote:Looks like I have a contender for my crown there. LOL.
Which crown is that Alan, the speedy cabinet construction or the c*cked up under stairs storage one
Steve
http://www.allford.co.uk
http://www.allford.co.uk
-
mark270981
- Subscriber
- Posts: 2766
- Joined: Sun Apr 04, 2010 8:06 pm
- Location: Sutton Coldfield
- Contact:
Re: c*ck up
LOL
--------------------------------------------------------------
ALOTBSOL
Mark - Sutton Coldfield
ALOTBSOL
Mark - Sutton Coldfield
Re: c*ck up
mark270981 wrote:Just out of interest, how long do you think that would take you Alan from start to finish? its 1700 high by 838 wide by 500 deep. all 18mm MDF.
Surely irrelevant, the question should be "how much profit could you make on it".
Anyway, I reckon it would take me about 1hr 14minutes, maybe quicker if I was allowed to use powertools rather than hand tools.
However, the Mrs would tell me to send it back anyway as it's not painted
Have a look at my facebook page and leave a comment or two.
Or browse my website Hand made kitchens Essex
Or browse my website Hand made kitchens Essex
-
mark270981
- Subscriber
- Posts: 2766
- Joined: Sun Apr 04, 2010 8:06 pm
- Location: Sutton Coldfield
- Contact:
Re: c*ck up
just wanted to satisfy my curiosity to be fair!!
I have my units hand painted on site
If they fitted that is!!
I have my units hand painted on site
--------------------------------------------------------------
ALOTBSOL
Mark - Sutton Coldfield
ALOTBSOL
Mark - Sutton Coldfield
Who is online
Users browsing this forum: engineerone and 1 guest